912-1141 Zoeller® 912 Pre-Assembled Sewage
Zoeller® 912-1141 912 Pre-Assembled Sewage Ejector System, 2 in NPT Discharge Pipe, 2 in Solid Handling, 4/10 hp, 115 V, 1 ph, Cast Iron, 1725 rpm Motor
Manufacturer: McTest-LeeTaxonomy
Brand: Sewage Pumps
Lee Supply #: 535939
Manufacturer Part #: 912-1141
UPC: 5351448008
Customer Part #:
Carmel
| Amperage Rating | : | 9.4 A |
| Discharge Pipe Size | : | 2 in NPT |
| Flow Rate | : | 90 gpm |
| Horsepower | : | 4/10 hp |
| Lee_Descr | : | 912-1141 - ZOELLER PREASSEMBLED SEWAGE SYSTEM - M264 PUMP 24" X 24" BASIN WITH COVER ANTI-FLOTATION DEVICE - 4/10HP 115V/1PH 2" DISCHARGE |
| Lee_UPC | : | 5351448008 |
| Material | : | Cast Iron |
| Maximum Head | : | 18 ft |
| Motor Speed | : | 1725 rpm |
| Outlet Size | : | 2 in |
| Phase | : | 1 ph |
| Series | : | 912 |
| Solids Handling | : | 2 in |
| Specifications | : | Non-Clogging Vortex Impeller |
| Temperature Rating | : | 130 deg F |
| Type | : | Pre-Assembled |
| UPC_Lee | : | 5351448008 |
| Voltage Rating | : | 115 V |
| Weight | : | 62.0 lb |
| Width | : | 48.0 in |
| Length | : | 40.0 in |
Zoeller®, 912-1141, Sewage Ejector System, Pre-Assembled, Series: 912, 90 gpm Flow Rate, 2 in Outlet, 115 V, 9.4 A, 1 ph, 4/10 hp, 18 ft Maximum Head, 2 in NPT Discharge Pipe, Specifications: Non-Clogging Vortex Impeller, 130 deg F, 2 in Solids Handling, Cast Iron, 1725 rpm Motor
- As with all Zoeller pumps, the Model 264 is 100% Factory Tested
- The Model 264 sewage pump is built with an engineered plastic base and vortex impeller capable of handling 2 in spherical solids reducing the chance of clogs and downtime
- The pump's 115 V electrical cord seal is sealed in the cover
- The pump switch is installed 180 deg from the 4 in inlet to prevent the float from being affected by the inflow of raw sewage
- The discharge pipe is plumbed with a pre-drilled 3/16 in weep hole to prevent the pump from becoming air-locked
- The polyethylene cover comes sealed and bolted down so the system is water and gas tight eliminating the escape of any odor
- The clear construction cover can be removed once the concrete is poured and finished